Responsive Image Banner

Ansaldo supplying 120 MW power plant

Premium Content

Combined-cycle facility for steelmaker Gruppo Arvedi

Ansaldo Energia has won a contract for a combined cycle power plant for steelmaker Gruppo Arvedi at its Trieste, Italy, area mill in Servola.

Ansaldo Energia won the tender for the supply of a new gas turbine to the Arvedi Group in Servola.

The order includes an AE64.3A gas turbine equipped with the latest generation technologies, including the Ansaldo Energia Plant Optimizer management system.

The plant, in combined-cycle configuration with a power of 120 MW, will be operational by the end of 2021.

With this investment, the Arvedi enters the Italian Capacity Market for electricity supply, whose implementation decree was approved by the Italian Ministry of Economic Development in June 2019. The Capacity Market, in line with the situation in other European countries, aims to ensure the adequacy and safety of the national electricity system in the presence of a strong renewable component—non-dispatchable by its very nature—by encouraging investments in efficient, low-polluting and flexible plants.

The solution proposed by Ansaldo Energia and chosen by the customer is able to ensure full compliance with the most stringent regulations on environmental impact.

POWER SOURCING GUIDE

The trusted reference and buyer’s guide for 83 years

The original “desktop search engine,” guiding nearly 10,000 users in more than 90 countries it is the primary reference for specifications and details on all the components that go into engine systems.

Visit Now

STAY CONNECTED



Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Latest News
Deere Debuts New P-Tier Compact Excavators
John Deere’s Justin Steger shares new features of the redesigned 17 P-Tier and 26 P-Tier compact excavators
Rolls-Royce completes successful test of methanol marine engine
The test of the high-speed engine is said to be a “world first”
Milestone for world’s largest OEM-agnostic autonomous mine
Project moves closer to becoming the world’s largest fully OEM-agnostic autonomous haulage operation, set for completion in 2025
CONNECT WITH THE TEAM
Becky Schultz Vice President of Content Tel: +1 480 408 9774 E-mail: becky.schultz@khl.com
Julian Buckley Editor Tel: +44 (0) 1892 784088 E-mail: julian.buckley@khl.com
Chad Elmore Managing Editor E-mail: chad.elmore@khl.com
Tony Radke Vice President of Sales Tel: +1 602 721 6049 E-mail: tony.radke@khl.com
CONNECT WITH SOCIAL MEDIA