Battery manufacturer Northvolt to build $5bn gigafactory in Canada

Digital render showing how the Northvolt Six gigafactory will look Digital render showing how the Northvolt Six gigafactory will look (Image: Northvolt)

Swedish battery manufacturer Northvolt has revealed plans to build a US$5 billion (CAN$7 billion) lithium-ion battery gigafactory outside Montreal in the Canadian province of Quebec.

The factory, called Northvolt Six, will eventually be able to produce 60 GWh of cell manufacturing capacity annually, with adjacent facilities for cathode active material production and battery recycling which it said would allow circular production at the site.

Construction of the first 30 GWh phase of the project on the site in McMasterville and Saint-Basile-le-Grand is due to commence before the end of 2023. The first operations are set to begin in 2026.

This initial phase of cathode and cell manufacturing, coupled with recycling, is expected to require a total investment of 5 billion USD (7 billion CAD) and employ up to 3,000 people.

POWER SOURCING GUIDE

The trusted reference and buyer’s guide for 83 years

The original “desktop search engine,” guiding nearly 10,000 users in more than 90 countries it is the primary reference for specifications and details on all the components that go into engine systems.

Visit Now

STAY CONNECTED



Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

CONNECT WITH THE TEAM
Becky Schultz Vice President of Content Tel: +1 480 408 9774 E-mail: [email protected]
Julian Buckley Editor Tel: +44 (0) 1892 784088 E-mail: [email protected]
Chad Elmore Managing Editor E-mail: [email protected]
Josh Kunz Power Progress Brand Manager Tel: +1 414 379 2672 E-mail: [email protected]
Roberta Prandi Power Progress International Brand Manager Tel: +39 334 6538183 E-mail: [email protected]