Read this article in 中文 Français Deutsch Italiano Português Español
CATL starts preproduction tests at Hungary plant
28 September 2026
In July this year, Power Progress reported that CATL had unveiled its new Techtrans II battery pack. This new model can support ultra-fast charging to 80% of capacity in around seven minutes, largely because reduced cell resistance can manage heat output.
The Techtrans II took center stage at IAA Transportation 2026 in Hanover, Germany in September.
CATL plant in Debrecen, Hungary (Photo: CATL)
Following on from that, CATL has reported the start of trial production at its new cell factory in Debrecen, Hungary. The goal is to validate equipment and manufacturing processes in advance of series production.
Testing of related production tech has been on-going since 2024. Following full sign off, the plant will have annual production capacity of around 100 GWh. This capacity will make the Debrecen plant the largest CATL facility outside of China.
CATL will be supplying a series of OEM passenger and light commercial vehicle manufacturers, many of which have manufacturing hubs in Hungary.
In addition to being the largest CATL site outside China, the new plant is likely to be the largest of its type in Europe. Currently, the largest cell production factory is operated by LG Energy in Wroclaw, Poland, with a reported annual output of 86 GWh.
POWER SOURCING GUIDE
The trusted reference and buyer’s guide for 83 years
The original “desktop search engine,” guiding nearly 10,000 users in more than 90 countries it is the primary reference for specifications and details on all the components that go into engine systems.
Visit Now
STAY CONNECTED


Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.
CONNECT WITH THE TEAM