New biomethane plant opens in Pernambuco, Brazil

Orizon Valorização de Resíduos has inaugurated a new biomethane production facility in Ecoparque Jaboatão in Pernambuco, located on the north-east coast of Brazil.

Using a complete biogas delivery system supplied by Greenlane Renewables, the new R$258 ($49 million) plant demonstrates how waste management and energy infrastructure can be integrated to produce renewable fuel.

The new plant collects biogas produced by decomposing waste which is then purified. The final product can be used within existing fossil gas distribution networks without modification.

Cascade LF, Greenlane's next-gen landfill gas upgrading system Cascade LF, Greenlane’s next-gen landfill gas upgrading system (Photo: Greenlane)

Gas comes from the 3,500 tonnes of trash per day collected from around Recife, Jaboatão dos Guararapes and Cabo de Santos Agostinho. From this, maximum output is about 110,000 cubic meters of gas per day.

Due to the continuous waste source, gas production will continue throughout the year.

While much of the gas will enter the Copergás (Pernambuco Gas Company) pipeline, it is hoped that availability of the fuel will support adoption of more gas-fuel vehicles by heavy-duty truck and urban transport operators.

“The inauguration of the biomethane plant at Ecoparque Jaboatão marks a milestone for the sustainable development of Pernambuco and Brazil, expanding the availability of competitive and sustainable energy solutions in the country,” said Milton Pilão, CEO of Orizon.

“With this new unit, we are increasing biomethane production with reliability, predictability and industrial-scale capacity. This solution enables our clients to advance their decarbonization goals with environmental integrity and operational efficiency, without compromising performance.”

POWER SOURCING GUIDE

The trusted reference and buyer’s guide for 83 years

The original “desktop search engine,” guiding nearly 10,000 users in more than 90 countries it is the primary reference for specifications and details on all the components that go into engine systems.

Visit Now

STAY CONNECTED


Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Latest News
Apollo introduces AWE 733 flotation tyres
New addition designed to reduce ground compaction
New additions complete Hyundai range of B-X electric forklifts
High-voltage systems deliver power needed to support heavy lifts
Scania and snow groomer OEM Prinoth sign battery pack delivery agreement
New long-term supply contract covers delivery of Scania’s Core 800 li-ion packs
CONNECT WITH THE TEAM
Becky Schultz Vice President of Content Tel: +1 480 408 9774 E-mail: becky.schultz@khl.com
Julian Buckley Editor Tel: +44 (0) 1892 784088 E-mail: julian.buckley@khl.com
Chad Elmore Managing Editor Tel: +1 262-347-8808 E-mail: chad.elmore@khl.com
Tony Radke Vice President of Sales Tel: +1 602 721 6049 E-mail: tony.radke@khl.com
CONNECT WITH SOCIAL MEDIA