Responsive Image Banner

New LPG carriers getting Wärtsilä fuel supply systems

Premium Content

Wärtsilä also supply cargo handling system

Wärtsilä has won the contract to supply the fuel supply systems for six new 93 000 m3 capacity liquid petroleum gas (LPG) carrier vessels.

The ships are being built at the Jiangnan Shipyard in China for Singapore-based Petredec and will be among the largest vessels of this type ever built, the company said. Petredec announced in late 2020 the ships will be powered by individual MAN B&W 6G60ME-LGIP dual-fuel engines capable of running on LPG.

Six new Petredec Liquid Petroleum Gas (LPG) carrier vessels will be supplied by Wärtsilä’s Cargo Handling and Fuel Supply systems.

The ships will be fitted with Wärtsilä’s cargo handling system and the Wärtsilä LPG Fuel Supply system (LFSS). Wärtsilä said it is currently the only company with LFSSs in operation, and has also a significant number of these units on order. The onboard Wärtsilä solutions will be supported with the company’s digital Operational Performance Improvement and Monitoring (OPERIM) system to provide real-time data that will allow optimal operational efficiency at all times, the company said.

POWER SOURCING GUIDE

The trusted reference and buyer’s guide for 83 years

The original “desktop search engine,” guiding nearly 10,000 users in more than 90 countries it is the primary reference for specifications and details on all the components that go into engine systems.

Visit Now

STAY CONNECTED



Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Latest News
Iveco Group posts year-on-year quarterly revenue decline
Truck and Bus division revenues down, while Powertrain volumes were slightly up
Cummins sees solid Q3, plans ‘strategic review’ of electrolyzers
Operating results strong but company recorded non-cash charges related to electrolyzer business
[VIDEO] Ditch Witch Adds Capacity with SK1000 Stand-on Skid Steer
Ditch Witch’s Brant Kukuk outlines the capabilities of the company’s new SK1000 stand-on skid steer
CONNECT WITH THE TEAM
Becky Schultz Vice President of Content Tel: +1 480 408 9774 E-mail: becky.schultz@khl.com
Julian Buckley Editor Tel: +44 (0) 1892 784088 E-mail: julian.buckley@khl.com
Chad Elmore Managing Editor E-mail: chad.elmore@khl.com
Tony Radke Vice President of Sales Tel: +1 602 721 6049 E-mail: tony.radke@khl.com
CONNECT WITH SOCIAL MEDIA

US Steel Tariffs Raise Equipment Costs

NEW ANALYSIS & FREE WHITEPAPER

Expanded US tariffs on steel and aluminium are pushing up construction equipment prices. Read the analysis and download the whitepaper for data and forecasts.

Read & Download