Responsive Image Banner

Production at first phase of Absheron field underway

Premium Content

New gas processing platform has capacity of 4 million cubic meters of gas per day

TotalEnergies and its partner SOCAR (State Oil Company of the Republic of Azerbaijan) announce the start of production of the first phase of development of the Absheron gas and condensate field in the Caspian Sea, around 100 km south-east of Baku.

This first phase connects a subsea production well to a new gas processing platform, itself linked to SOCAR’s existing facilities in Oil Rocks. It has production capacity of 4 million cubic meters of gas per day and 12,000 barrels a day of condensate. The gas will be sold on the domestic market in Azerbaijan.

The development of the Absheron field provides an additional gas supply to meet growing demand, at a competitive technical cost and low greenhouse gas emissions intensity, in line with TotalEnergies’ strategy.

TotalEnergies and SOCAR both hold a 50% interest in the project, which is operated by the joint company JOCAP (Joint Operating Company of Absheron Petroleum).

“We are very pleased to announce the start-up of the Absheron gas field, the result of our exploration team’s success. This project is in line with the Company’s strategy of meeting the growing demand for gas and reinforces our partnership with the national company SOCAR” said Nicolas Terraz, president, Exploration & Production at TotalEnergies.

POWER SOURCING GUIDE

The trusted reference and buyer’s guide for 83 years

The original “desktop search engine,” guiding nearly 10,000 users in more than 90 countries it is the primary reference for specifications and details on all the components that go into engine systems.

Visit Now

STAY CONNECTED



Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Latest News
Tough North America market hits JLG Q3 sales
Operating income also drops in challenging environment North American 
Carraro to show 20.25SI axle at Agritechnica 2025
Axle features on new high-power tractor from Lindner
Daniel Strucks to head MAN Engines
Strucks has previously held a series of senior roles across MAN Truck & Bus
CONNECT WITH THE TEAM
Becky Schultz Vice President of Content Tel: +1 480 408 9774 E-mail: becky.schultz@khl.com
Julian Buckley Editor Tel: +44 (0) 1892 784088 E-mail: julian.buckley@khl.com
Chad Elmore Managing Editor E-mail: chad.elmore@khl.com
Tony Radke Vice President of Sales Tel: +1 602 721 6049 E-mail: tony.radke@khl.com
CONNECT WITH SOCIAL MEDIA

US Steel Tariffs Raise Equipment Costs

NEW ANALYSIS & FREE WHITEPAPER

Expanded US tariffs on steel and aluminium are pushing up construction equipment prices. Read the analysis and download the whitepaper for data and forecasts.

Read & Download