Generac to build additional plant in Wisconsin

Premium Content

New facility to help address demand for industrial products

Generac’s Modular Power Systems (MPS) are generators which the company said are compact for rooftop or parking garage installations and help take the complexity out of paralleling total power generators. (Photo: Generac)

Generac Power Systems Inc. announced its plans to build a new manufacturing facility in Beaver Dam, Wis.

To help fulfill the growing demand for Generac’s industrial generators, Generac is planning to build an approximately 320,000 sq. ft. facility in the Highway 151 Business Park. Including a mix of manufacturing and office employees, the facility will eventually employ up to 350 to 400 people in total at the location.

“The demand for our industrial generators continues on a rapid growth trajectory, and this new facility will help us to best meet the needs of our customers,” said Aaron Jagdfeld, president and CEO of Generac. “Additionally, the new manufacturing location demonstrates Generac’s dedication to shaping the future of industrial power generation.”

Pending city approval of the project, Generac will begin construction later this year, with the aim of completing construction by early 2025.

“Generac’s intended investment in our region is a testament to the business-friendly environment we’ve worked hard to cultivate,” said Becky Glewen, Mayor of Beaver Dam.

“The establishment of this new plant translates to meaningful employment, stronger families, and a flourishing economy for Beaver Dam and the region and speaks volumes about the confidence that industry leaders like Generac have in our workforce, quality of life, and the infrastructure we offer.”

POWER SOURCING GUIDE

The trusted reference and buyer’s guide for 83 years

The original “desktop search engine,” guiding nearly 10,000 users in more than 90 countries it is the primary reference for specifications and details on all the components that go into engine systems.

Visit Now

Latest News
Canada signs temporary order to align with US emissions standards
Order will allow sale of US-built engines in Canada to continue
Cummins announces Q3 results and record EBITDA
Loss reported by Accelera due to lower electrolyzer sales
Reusing simulation data when the requirements change
How engineers can respond to shifting requirements without restarting the optimization from scratch
CONNECT WITH THE TEAM
Becky Schultz Vice President of Content Tel: +1 480 408 9774 E-mail: becky.schultz@khl.com
Julian Buckley Editor Tel: +44 (0) 1892 784088 E-mail: julian.buckley@khl.com
Chad Elmore Managing Editor Tel: +1 262-347-8808 E-mail: chad.elmore@khl.com
Tony Radke Vice President of Sales Tel: +1 602 721 6049 E-mail: tony.radke@khl.com
CONNECT WITH SOCIAL MEDIA