Danish manufacturer HG has added a 3 tonne electric site dumper to its range, joining the 1 tonne and 2 tonne models already available.

The HG E3000 has a 29kWh lithium-ion battery pack and will deliver up to 12 hours of “effective runtime” on a single charge. The articulated drivetrain uses four individual wheel motors, the same arrangement as the 2 tonne E2000.

The integrated charger provides a full charge in about 4 hours and the battery pack comes with a 5 year warranty. The bucket comes with 180° swivel tip as standard and there is an optional high tip version.

Photo of the HG E3000 electric site dumper working on site. (Photo: HG) HG’s new E3000, an electric 3 tonne site dumper. (Photo: HG)

The HG E3000 is expected to be ready for delivery in early 2026.

Nikolaj Birkerod, CEO of HG, said; “With the HG E3000, we once again prove that electric dumpers are not only better for people and the environment – they are also more efficient, cheaper to operate, and can run more than a full working day on a single charge.

“Electrification only makes sense when range is no longer a concern. With 3 tonne dumpers, we are proving, as we already have with 2 tonne dumpers, that we can deliver on both performance and reliability – while enabling customers to save 15% per operating hour compared to a diesel dumper.”

HG has been producing site dumpers since 1971 and launched its first battery electric model, a 1 tonne machine, in 2019, with the 2 tonne E2000 following in 2023. It said there are 500 HG electric dumpers currently in service.

POWER SOURCING GUIDE

The trusted reference and buyer’s guide for 83 years

The original “desktop search engine,” guiding nearly 10,000 users in more than 90 countries it is the primary reference for specifications and details on all the components that go into engine systems.

Visit Now

Latest News
Canada signs temporary order to align with US emissions standards
Order will allow sale of US-built engines in Canada to continue
Cummins announces Q3 results and record EBITDA
Loss reported by Accelera due to lower electrolyzer sales
Reusing simulation data when the requirements change
How engineers can respond to shifting requirements without restarting the optimization from scratch
CONNECT WITH THE TEAM
Becky Schultz Vice President of Content Tel: +1 480 408 9774 E-mail: becky.schultz@khl.com
Julian Buckley Editor Tel: +44 (0) 1892 784088 E-mail: julian.buckley@khl.com
Chad Elmore Managing Editor Tel: +1 262-347-8808 E-mail: chad.elmore@khl.com
Tony Radke Vice President of Sales Tel: +1 602 721 6049 E-mail: tony.radke@khl.com
CONNECT WITH SOCIAL MEDIA