INNIO Makes More Cuts At Waukesha Facility
29 October 2019
INNIO is “instituting a partial business closing” of its facility in Waukesha, Wisconsin, USA, which produces Waukesha Gas Engines.
The move will eliminate 75 to 120 hourly positions from the facility’s current 153, the company told the state of Wisconsin in its layoff notice. The company will begin eliminating positions Dec. 31.
Founded in 1906, Waukesha’s distinctive orange-colored gas engines have been manufactured in Waukesha and more recently from Welland, Ontario, Canada. The 450 000 sq. ft. facility began production in 2018.
The Waukesha products are primarily used in compression and transporting gas applications. In 2018, GE sold its Distributed Power business, which included the Waukesha and Jenbacher brands, to a private equity firm for US$3.25 billion. The brand was renamed INNIO in late 2018.
POWER SOURCING GUIDE
The trusted reference and buyer’s guide for 83 years
The original “desktop search engine,” guiding nearly 10,000 users in more than 90 countries it is the primary reference for specifications and details on all the components that go into engine systems.
Visit Now
STAY CONNECTED
Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.