Responsive Image Banner

BAE Systems contracted to modernize U.S. Navy destroyer

Premium Content
U.S. Navy USS Ross (DDG 71) guided-missile destroyer BAE Systems has received a $107.7 million contract from the U.S. Navy to modernize the guided-missile destroyer USS Ross (DDG 71). (Photo: BAE Systems)

BAE Systems, which provides ship repair, maintenance, modernization, conversion and overhaul services to select government and commercial customers, announced it has received a $107.7 million contract from the U.S. Navy to modernize the USS Ross (DDG 71), an Arleigh Burke class guided-missile destroyer commissioned by the Navy in June 1997.

Under the extended dry-docking selected restricted availability (EDSRA) contract, BAE Systems will dry-dock the USS Ross to perform maintenance on the underwater hull, repair its main propulsion system, preserve internal ballast and fuel tanks and external superstructure and rehabilitate crew berthing and dining compartments. The contract includes options that, if exercised, would bring the cumulative value to $123.8 million.

The 505.25 ft. long vessel – which was named after the first Medal of Honor recipient of World War II, Donald K. Ross – has a beam of 67 ft., draft of 30.5 ft. and displacement of approximately 8300 tons (full load). Its propulsion system consists of four General Electric LM 2500 gas turbine engines capable of propelling the ship to speeds greater than 31 knots. Two controllable, reversible pitch, five-blade propellers assist in rapid acceleration and maneuverability.

Modernization work on the USS Ross will be performed at BAE Systems’ Norfolk, Va., shipyard and is scheduled to take more than 500 days. Upon its scheduled completion in April 2024, the 16-year-old ship will be capable of serving in the U.S. Navy’s fleet for another 10 years.

“This is an important job for our employees, subcontractors and the Navy to accomplish,” said Mike Bruneau, vice president and general manager of BAE Systems Norfolk Ship Repair. “We look forward to meeting the long-term maintenance goals for USS Ross to sustain the future capability and readiness of the ship.”

POWER SOURCING GUIDE

The trusted reference and buyer’s guide for 83 years

The original “desktop search engine,” guiding nearly 10,000 users in more than 90 countries it is the primary reference for specifications and details on all the components that go into engine systems.

Visit Now

STAY CONNECTED



Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Latest News
Shell Rotella launches PC-12 Knowledge Hub
Site launched to help industry understand upcoming diesel engine oil category
Bonsai to show Amiga Flex autonomous machine at Agritechnica
Vision-based autonomy can help improve productivity on farms
JCB’s Phil Layton confirmed as next CECE president
JCB’s Phil Layton to take over presidency from José Antonio Niete
CONNECT WITH THE TEAM
Becky Schultz Vice President of Content Tel: +1 480 408 9774 E-mail: becky.schultz@khl.com
Julian Buckley Editor Tel: +44 (0) 1892 784088 E-mail: julian.buckley@khl.com
Chad Elmore Managing Editor E-mail: chad.elmore@khl.com
Tony Radke Vice President of Sales Tel: +1 602 721 6049 E-mail: tony.radke@khl.com
CONNECT WITH SOCIAL MEDIA

US Steel Tariffs Raise Equipment Costs

NEW ANALYSIS & FREE WHITEPAPER

Expanded US tariffs on steel and aluminium are pushing up construction equipment prices. Read the analysis and download the whitepaper for data and forecasts.

Read & Download