Jeff Eisenberg on the Stage V genset rental challenge
06 February 2024
Diesel-powered generators have been on construction and other sites for decades, and this will likely continue. The applications include charging electric equipment where the grid can’t yet cope. European Stage V diesel emission requirements create particular challenges for diesel generators. Why is that, and what will it take to improve the situation?
Stage V diesel engines have been required in all new non-road equipment since January 2020 in the European Union. Stage V engines are much cleaner than the first emission requirement Stage I introduced in 1997, and in the case of particulate emissions, 97% cleaner. Diesel engines between 37kw and 560kw have the strictest emission limits, and this range covers many popular generator sizes in the rental industry.
POWER SOURCING GUIDE
The trusted reference and buyer’s guide for 83 years
The original “desktop search engine,” guiding nearly 10,000 users in more than 90 countries it is the primary reference for specifications and details on all the components that go into engine systems.
Visit Now
STAY CONNECTED


Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.
CONNECT WITH THE TEAM