Responsive Image Banner

London To Madrid On One Tank Of Gas

Premium Content

24 October 2018

An Iveco Stralis NP (Natural Power) 460 hp truck has completed what the company said is believed to be the longest ever journey by road on a single fill of liquid natural gas (LNG). The trip was undertaken, Iveco said, to demonstrate the suitability of natural gas-powered vehicles for domestic and European road transport.

The Stralis NP set off from London and, after the short sea crossing from Dover to Calais, completed the 1728 km road journey to Madrid without needing to refuel – exceeding the vehicle’s official range of 1600 km. This equates to an LNG fuel cost saving of circa €228 for the outward journey. 

Iveco, a brand of CNH Industrial N.V., last year accomplished a similar feat completing the 1347 km journey from John O’Groats to Land’s End in the UK on a single fill in a 400 hp Stralis NP, but this time, Iveco said the aim was to set the bar even higher. 

 Despite the heavy traffic on the UK side of the English Channel, a strong head wind in France and the hilly Spanish section of the route, the Stralis NP recorded an impressive average fuel consumption of 22.6 kg per 100 km. Prior to the trip, Iveco carefully planned the journey using MyBestRoute: a web-based application developed by Michelin for Stralis NP customers. It allows drivers and fleet managers to select the optimum route for any European journey, including plotting LNG refueling stations and estimating the total cost of the trip for both diesel and natural gas-powered trucks.

 

POWER SOURCING GUIDE

The trusted reference and buyer’s guide for 83 years

The original “desktop search engine,” guiding nearly 10,000 users in more than 90 countries it is the primary reference for specifications and details on all the components that go into engine systems.

Visit Now

STAY CONNECTED



Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Latest News
Parker adds pump, valve to fluid power portfolio
Company expands bent axis pump and mobile valve lines
Wärtsilä debuts software solution for BESS users
GEMS Pulse transforms battery data into actionable insights
Construction work at US Hyundai-LG battery plant resumes
Construction was disrupted for six weeks amid visa clarifiction 
CONNECT WITH THE TEAM
Becky Schultz Vice President of Content Tel: +1 480 408 9774 E-mail: becky.schultz@khl.com
Julian Buckley Editor Tel: +44 (0) 1892 784088 E-mail: julian.buckley@khl.com
Chad Elmore Managing Editor E-mail: chad.elmore@khl.com
Tony Radke Vice President of Sales Tel: +1 602 721 6049 E-mail: tony.radke@khl.com
CONNECT WITH SOCIAL MEDIA