Responsive Image Banner

Royal approval for Volvo CE’s new electric wheeled loader facility

Premium Content

Volvo Construction Equipment (Volvo CE) has inaugurated a new building that will be used in the assembly of medium and large electric wheeled loaders.

Prince Carl Philip, Princess Sofia, Mikael Liljestrand, Melker Jernberg, Maria Andrén and Governor of Värmland Georg Andrén. Photo: Volvo CE Prince Carl Philip, Princess Sofia, Mikael Liljestrand, Melker Jernberg, Maria Andrén and Governor of Värmland Georg Andrén. Photo: Volvo CE

The 1,500m² building cost US$6.3 million and is located at the company’s site in Arvika, Sweden. It will allow the site to free up areas inside its existing factory for the production of electric wheeled loaders.

Designated an after-flow facility, it is where wheeled loaders will come for the final stage in the production process and where visitors can test drive the latest machines fresh from the assembly line.

Prince Carl Philip, a member of the Swedish Royal Family, toured the new facilities and tested out the Volvo L110, one of the wheeled loaders being produced there.

Volvo CE has stated that its goal is to be entirely fossil free by 2040 and achieve 35% electric machine sales by 2030.

Melker Jernberg, Head of Volvo CE, said, “This new facility is an inspiration for a future built on sustainable solutions. We are proud to be at the forefront of industry change with large-scale investments, not just here in Arvika but around the globe, that support a transformation towards electrification. Together, we are moving closer towards fossil-free machines.”

Volvo CE says that Arvika has already moved to reduce its internal climate footprint by 350 tons of CO2 through a variety of emission reduction efforts in recent years.

Power Progress Networking Forum

The Tariff Report Everyone Will Want...

All Power Progress Networking Forum attendees will receive access to the updated digital report by Off-Highway Research, 'The Impact of U.S. Tariffs on the Construction Equipment Industry.'

Register your interest
POWER SOURCING GUIDE

The trusted reference and buyer’s guide for 83 years

The original “desktop search engine,” guiding nearly 10,000 users in more than 90 countries it is the primary reference for specifications and details on all the components that go into engine systems.

Visit Now

STAY CONNECTED



Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Latest News
Leadership changes at John Deere Power System
Julien Le Vély replaces Nick Block as director of Global Marketing & Sales
Instagrid announces Asian rental partner
Portable battery power company finds Singapore partner
Kobelco expands Trimble Earthworks through North American dealers
Kobelco and Trimble are expanding their existing relationship in North America
CONNECT WITH THE TEAM
Becky Schultz Vice President of Content Tel: +1 480 408 9774 E-mail: becky.schultz@khl.com
Julian Buckley Editor Tel: +44 (0) 1892 784088 E-mail: julian.buckley@khl.com
Chad Elmore Managing Editor E-mail: chad.elmore@khl.com
Tony Radke Vice President of Sales Tel: +1 602 721 6049 E-mail: tony.radke@khl.com
CONNECT WITH SOCIAL MEDIA