Responsive Image Banner

Turboden supplying equipment for Egypt compressor station

Premium Content

16 February 2021

Gas compression system will converse natural gas, reduce CO2

Turboden S.p.A., part of Mitsubishi Heavy Industries, Ltd. (MHI), has received an order for two sets of 14 MW binary cycle power generation equipment, which will be used as part of a gas compression system to improve the efficiency of the GASCO Dahshour gas compression station in Egypt. The equipment uses Turboden’s Organic Rankine Cycle (ORC) system.

Egyptian Natural Gas Holding Co (GASCO) will install the gas compression system that includes the power generation equipment, which will generate 28 MW of power using the waste heat from four existing gas turbines. Siemens Energy will also supply an additional gas turbine and 20 MW electric-motor-driven compressors to the system. The new configuration will improve the system’s compressed gas capacity and overall efficiency to improve CO2 emissions.

In addition to creating 192 GW of power per annum, the configuration will conserve more than 2.3 Bcfy (65 X 106 m3/y) of natural gas. The system will also reduce 120,000 t/y of CO2 equivalent.

POWER SOURCING GUIDE

The trusted reference and buyer’s guide for 83 years

The original “desktop search engine,” guiding nearly 10,000 users in more than 90 countries it is the primary reference for specifications and details on all the components that go into engine systems.

Visit Now

STAY CONNECTED



Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Latest News
Euroguard partners align on MSAS vessels
Partners consolidate progress, set direction for next phase of work on medium-sized semi-autonomous surface vessels
MRS Electronic, EG Electronics partner in Nordic region
EG Electronics to distribute MRS Electronic product portfolio in the region
Rolls-Royce to provide backup power at Kuwait airport
MTU gen-sets to provide emergency power for new airport terminal
CONNECT WITH THE TEAM
Becky Schultz Vice President of Content Tel: +1 480 408 9774 E-mail: becky.schultz@khl.com
Julian Buckley Editor Tel: +44 (0) 1892 784088 E-mail: julian.buckley@khl.com
Chad Elmore Managing Editor E-mail: chad.elmore@khl.com
Tony Radke Vice President of Sales Tel: +1 602 721 6049 E-mail: tony.radke@khl.com
CONNECT WITH SOCIAL MEDIA

US Steel Tariffs Raise Equipment Costs

NEW ANALYSIS & FREE WHITEPAPER

Expanded US tariffs on steel and aluminium are pushing up construction equipment prices. Read the analysis and download the whitepaper for data and forecasts.

Read & Download