Baker Hughes LM9000 Reaches Key Testing Milestone

09 June 2020

Baker Hughes said it had completed the First Engine to Test (FETT) for the LM9000 aeroderivative gas turbine. The test took place at the company’s advanced turbomachinery testing facilities in Florence and Massa, Italy.

In December 2018, NOVATEK selected Baker Hughes for the supply of LM9000 aeroderivative gas turbines for the Arctic LNG 2 Project. Baker Hughes said the successful FETT completion paves the way for the supply of the same turbines for NOVATEK’s new LNG projects.

The successful test completion showed the LM9000 achieving a simple cycle efficiency in excess of 44% and a power output 15% higher compared to industry peers, the company said. This efficiency is key to driving lower carbon intensity and combined with lower NOx emissions (15 ppm in dry condition, 40% lower than competing technology) makes for a more environmentally sensitive solution.  A small footprint and module design for fast and easy maintenance make the LM9000 the gas turbine suitable for all mechanical drive and power generation applications, the company said.

“This is a crucial milestone for the ongoing development of our innovative LM9000 turbine technology and an important step forward in the on time delivery of Arctic LNG 2, which continues to be on track despite COVID-19 challenges,” said Rod Christie, executive vice president, Turbomachinery & Process Solutions, Baker Hughes. “Building on our 30-year-plus track record of delivering highly efficient and reliable LNG technology, the FETT results are a strong recognition of the LM9000’s flexibility, reliability and suitability for major LNG projects around the world such as Arctic LNG 2.”

About the LM9000

The 65 MW LM9000 offers a 50% increase of meantime between maintenance intervals versus current aeroderivative technology – the longest in the industry, Baker Hughes said.  With the ability to start in a fully pressurized condition, and 24-hour engine swap capability, the LM9000 can also reach over 99% availability for best-in-class total cost of ownership.

Co-developed by Baker Hughes and GE, the LM9000 features a new driver specifically designed for the needs of LNG production. The design utilizes free-power turbine architecture that provides higher efficiency and enables the unit to operate over a wide range of speed settings from 2600 rpm to 3780 rpm with virtually unaffected power and efficiency. The free-power turbine also allows 50 Hz and 60 Hz power generation without needing a gearbox.

In addition to LNG applications both on and offshore, the LM9000 can provide simple cycle, cogeneration and combined cycle power generation to boost the supply of electricity to the world’s energy plants and power grids.

Baker Hughes has invested in producing uniquely designed engineering and manufacturing tools, test beds and equipment for the LM9000 in its Florence and Massa facilities in Italy.

FETT results

“The FETT results confirm the LM9000 turbine is the right choice for NOVATEK’s LNG projects. In addition to better technical specifications, the machines also stand out in terms of environmental performance that will truly contribute to NOVATEK’s strategy of producing the greenest LNG,” said Igor Chasnyk, director for LNG projects, NOVATEK.

The successful FETT leveraged Baker Hughes’ turbomachinery remote testing capabilities to overcome travel restrictions imposed by COVID-19. More than 80 experts from various locations were connected remotely to perform the Full Speed and Full Load test. In addition, remote witness technology, such as smart glasses and helmets, enabled real-time and seamless sharing of machine inspections and virtual testing performed in Massa with the extended teams around the world.

Baker Hughes’ overall scope of work for Arctic LNG 2 includes the supply of turbomachinery equipment for power generation and three liquefaction trains on gravity-based structures (GBS) that will produce 6.6 million tons of LNG per annum each, for a total production of 19.8 MTPA.

STAY CONNECTED



Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

POWER SOURCING GUIDE

The trusted reference and buyer’s guide for 83 years

The original “desktop search engine,” guiding nearly 10,000 users in more than 90 countries it is the primary reference for specifications and details on all the components that go into engine systems.

Visit Now

CONNECT WITH THE TEAM
Becky Schultz Vice President of Content Tel: +1 480 408 9774 E-mail: [email protected]
Julian Buckley Editor Tel: +44 (0) 1892 784088 E-mail: [email protected]
Chad Elmore Managing Editor E-mail: [email protected]
Josh Kunz Power Progress Brand Manager Tel: +1 414 379 2672 E-mail: [email protected]
Roberta Prandi Power Progress International Brand Manager Tel: +39 334 6538183 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA