Wärtsilä supplying upgrade to Egyptian power plant

New equipment will add about 20 MW of output

Wärtsilä will deliver new generating equipment to add about 20 MW of output to the existing Borg El Arab power plant located southwest of Alexandria, Egypt. Additionally, Wärtsilä will upgrade the existing 40 MW Kahraba power plant with the latest generation control system.

The Borg El Arab plant currently operates with four Wärtsilä 34SG engines running on natural gas. As a result of increased industrial demand for electricity in the region, additional generating capacity is needed, and because of the reliability of the existing operation, an additional two Wärtsilä 34SG engines was deemed to be the optimal solution.

“Industrial growth is vital to the region’s economic development, and a reliable power supply is essential for driving this growth,” said Magdi El Badry, chairman and managing Director of Kahraba. “We have been extremely satisfied with the efficiency and reliability of the Wärtsilä engines and the approach of Wärtsilä’s personnel in serving our needs to optimize our operations. This is why we had no hesitation in selecting Wärtsilä again for this plant expansion project.”

Egypt, which has one of the largest electricity grids on the African continent, is making increasing use of renewable energy. The government has set targets for renewables to comprise 42% of the country’s electricity mix by 2035, based on rapid solar and wind energy deployment. The fast-starting and stopping capabilities of Wärtsilä’s gas engines provide the grid balancing needed to compensate for the intermittency of renewables. Wärtsilä engines are ready to also operate on sustainable fuels in the future, once they become widely available, which makes them a future-proof solution. Already today Wärtsilä engines can use synthetic and carbon-neutral methane and methanol, and hydrogen blends. Sustainable fuels together with engines can take care of long-term energy storage needs for periods with persistently low wind or solar conditions.

Kahraba is one of Egypt’s most prominent independent power producing (IPP) companies and the country’s only authorized private buyer and seller of gas. Wärtsilä has earlier delivered a number of power generating projects for Kahraba and other subsidiaries of EKH. The extended Borg El Arab plant is expected to become fully operational in 2023.

POWER SOURCING GUIDE

The trusted reference and buyer’s guide for 83 years

The original “desktop search engine,” guiding nearly 10,000 users in more than 90 countries it is the primary reference for specifications and details on all the components that go into engine systems.

Visit Now

STAY CONNECTED



Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

CONNECT WITH THE TEAM
Becky Schultz Vice President of Content Tel: +1 480 408 9774 E-mail: [email protected]
Julian Buckley Editor Tel: +44 (0) 1892 784088 E-mail: [email protected]
Chad Elmore Managing Editor E-mail: [email protected]
Tony Radke Vice President of Sales Tel: +1 480 478 6302 E-mail: [email protected]
Roberta Prandi Power Progress International Brand Manager Tel: +39 334 6538183 E-mail: [email protected]