Responsive Image Banner

‘World’s first’ hydrogen-powered backhoe loader deployed on £10bn Lower Thames Crossing

JCB's hydrogen-powered backhoe loader being refuelled with hydrogen fuel provided by hydrogen supplier, Ryze JCB’s hydrogen-powered backhoe loader being refuelled with hydrogen fuel provided by hydrogen supplier, Ryze (Image courtesy of National Highways)

The UK’s £10 billion Lower Thames Crossing project has become the first major infrastructure programme in Britain to commit to carbon-neutral construction, with the live deployment of a hydrogen-powered backhoe loader on site.

National Highways confirmed that the project, which will connect Kent and Essex via a new road and tunnel, has introduced a JCB-built, hydrogen-fuelled backhoe loader for survey work near Gravesend, Kent. It is the first time such machinery, which uses a hydrogen-powered internal combustion engine, has been used outside a test environment. The machine is being operated by Skanska, the project’s delivery partner in Kent, supplied by Flannery Plant Hire and fuelled by Ryze.

The deployment is expected to cut more than one tonne of CO₂ equivalent in its first month of use. National Highways said the move is part of a strategy to eliminate diesel from worksites by 2027, supported by what it described as the UK’s largest-ever purchase of green hydrogen for a construction project.

The Lower Thames Crossing, linking the counties of Kent and Essex, has set a target to reduce its construction carbon footprint by 70% through the adoption of low-carbon materials and methods, with any residual emissions to be offset in the early 2030s. The scheme also plans to use only low-carbon steel and concrete.

Matt Palmer, executive director for the Lower Thames Crossing, said the project will “prove that the British construction industry has the vision and skills to build the projects needed to drive growth in a way that enhances, not impacts, the local environment.”

JCB managing director for global major accounts Steve Fox described the live deployment as a “huge milestone,” noting it is the first time hydrogen has been proven as a carbon-neutral fuel in a working construction machine on a major UK project.

JCB has previously sent a hydrogen-powered machine out for trials at Gallagher’s Hermitage Quarry in Kent earlier this year and the backhoe loader is undergoing final testing and validation, with plans to go into full production at the OEM’s Rocester factory in Staffordshire in 2026.

The Lower Thames Crossing received planning permission in March 2025, aims to double road capacity across the Thames, ease congestion at the Dartford Crossing and create a direct freight route between the South East ports, the Midlands and the North. Construction could begin in 2026, with opening scheduled for the early 2030s.

Power Progress Networking Forum

The Tariff Report Everyone Will Want...

All Power Progress Networking Forum attendees will receive access to the updated digital report by Off-Highway Research, 'The Impact of U.S. Tariffs on the Construction Equipment Industry.'

Register your interest
POWER SOURCING GUIDE

The trusted reference and buyer’s guide for 83 years

The original “desktop search engine,” guiding nearly 10,000 users in more than 90 countries it is the primary reference for specifications and details on all the components that go into engine systems.

Visit Now

STAY CONNECTED



Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Latest News
Hatz appoints distributors in Latin America, Caribbean
Newly authorized distributes intended to strengthen the company’s presence in the region
Engineering smarter hydraulic systems
Texas Hydraulics expands engineering service offering for OEM applications
Jetstream of Houston adds hot water to waterblaster
The 2000 Series is powered by Jetstream 2000 Series bareshaft pump, Rehlko or JDPS engine
CONNECT WITH THE TEAM
Becky Schultz Vice President of Content Tel: +1 480 408 9774 E-mail: becky.schultz@khl.com
Julian Buckley Editor Tel: +44 (0) 1892 784088 E-mail: julian.buckley@khl.com
Chad Elmore Managing Editor E-mail: chad.elmore@khl.com
Tony Radke Vice President of Sales Tel: +1 602 721 6049 E-mail: tony.radke@khl.com
CONNECT WITH SOCIAL MEDIA