Cummins to supply large U.S. data center project

Premium Content

BESS solution adds layer of capability to the project’s power architecture

Cummins Inc. said its Power Generation business has been selected to supply battery energy storage systems (BESS) for a large U.S. data center project, supporting utility-defined requirements for managing AI-driven load fluctuations, mitigating load oscillations and enhancing ride-through performance.

Cummins selected to supply battery energy storage systems for large U.S. data center project. (Photo: Cummins)

The company said the announcement marks a significant milestone for its BESS business as this project would be the company’s largest BESS deployment to date. It also reflects Cummins’ continued role in supporting the North American data center market with reliable, sustainable power solutions.

“This project is an important achievement for Cummins and reflects the confidence customers place in our ability to deliver innovative energy solutions at scale,” said Jenny Bush, president of Cummins’ Power Systems business. “As demand for data center capacity continues to grow, Cummins is well positioned to support customers with a broad portfolio of power solutions, from diesel standby and natural gas prime power to BESS and integrated microgrid solutions. This project reinforces our commitment to helping customers build reliable, resilient and increasingly sustainable power infrastructure.”

The BESS solution adds another layer of capability to the project’s power architecture. The system is designed to help meet utility-defined requirements for managing AI-driven load fluctuations, mitigating load oscillations, and supporting ride-through performance. It can rapidly charge or discharge to reduce demand spikes, improve power quality and maintain a more stable load profile at the utility interconnection point.

For data center developers, BESS is emerging as a strategic power enabler. As grid constraints intensify, interconnection queues grow longer and energy costs increase, BESS can help accelerate deployment timelines, enhance resilience and optimize available power capacity.

Launched in May 2025, Cummins BESS solutions reflect the company’s commitment to innovation and evolving with the needs of its customers.

Cummins offers a flexible, utility-scale BESS solution designed to support near-term power availability and long-term energy resilience strategies. Whether deployed as a bridge-to-grid solution, integrated with backup power systems or incorporated into a broader microgrid architecture, Cummins BESS can help customers maximize available grid capacity, manage peak demand and meet utility-defined load-management requirements by smoothing rapid fluctuations in AI-driven power demand.

“The future of data center growth depends on finding smarter, faster ways to deploy and manage power. BESS is quickly becoming a critical part of the modern data center power strategy,” Bush said. “From bridge-to-grid applications and peak demand management to long-term resiliency, BESS gives data center operators greater flexibility to deploy, optimize and scale their power infrastructure.”

POWER SOURCING GUIDE

The trusted reference and buyer’s guide for 83 years

The original “desktop search engine,” guiding nearly 10,000 users in more than 90 countries it is the primary reference for specifications and details on all the components that go into engine systems.

Visit Now

STAY CONNECTED


Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Latest News
Himoinsa establishes subsidiary in New Zealand
Company continues to consolidate its presence in Asia-Pacific region
Panel announced for ‘Hidden Cost of Heat’ webinar
Experts will discuss how smarter cooling can improve uptime, reduce costs and boost equipment performance
Dukosi demos DK-NFLINK wireless battery pack comms system
New system removes complex wiring from battery packs
CONNECT WITH THE TEAM
Becky Schultz Vice President of Content Tel: +1 480 408 9774 E-mail: becky.schultz@khl.com
Julian Buckley Editor Tel: +44 (0) 1892 784088 E-mail: julian.buckley@khl.com
Chad Elmore Managing Editor Tel: +1 262-347-8808 E-mail: chad.elmore@khl.com
Tony Radke Vice President of Sales Tel: +1 602 721 6049 E-mail: tony.radke@khl.com
CONNECT WITH SOCIAL MEDIA