Equipment was unveiled at iVT Expo in Cologne
The orders have primarily come from the European and Southeast Asian markets.
It was designed from the ground up as an all-electric platform.
The electric-hybrid buses will be built this year.
Completed over 2026 and ’27, the installation will output 282 MW
Start of production will be pushed back from 2027 to the 2030s
Sponsored Content
CONNECT WITH THE TEAM



